We have today started to have our new central heating installed, what a bloody mess the house is, this could possibly have had something to do with the fact that I had to knock part of a wall out at the same time so that they could put pipes behind the plaster board wall so as to make the job tidier. It was always the plan to knock out this wall (and heating cupboard) when the heating was in, as it is going to be part of the kitchen, and not a hallway and kitchen as it is now, but I didn't expect to be doing it whilst they were actually putting in radiators and gas piping, We get the new kitchen in in December just before Xmas, and at the same time all the kitchen and dining area and new bit(old hallway) are getting a tiled floor layed, we are getting the gas meter moved from the meter point in the porch/shed to an area outside and in front of the shed, the shed/porch will then be knocked into one big room and this is going to be used as a utility room, the washer and dryer will be out there along with a chest freezer and a few of the units from our present kitchen. We have workmen coming to lay the bearers for our new shed which is getting erected on Friday, i should then be able to start filling it.
Ah well its all good fun here just a bloody lot of dust.
Subscribe to:
Post Comments (Atom)
2 comments:
I hope you get it all done for Xmas! At least you'll be all posh when its done. I'll never be posh, we get decorated about once every 15 yrs at my house!
I wish it was just summat as simple as decorating, decorating i can cope with!!!!!
Post a Comment